N0. |
DOCUMENT |
文件 |
序號 |
||
01 |
Organization chart |
人事架構圖 |
02 |
Process flow chart |
工序流程圖 |
03 |
Quality manual |
質量手冊 |
04 |
Quality control procedure |
檢驗指引 |
05 |
Production plan & schedule & record |
生產計劃及生產進度報告 |
06 |
Incoming material inspection report |
來料檢驗報告 |
07 |
In-line inspection report |
半成品檢驗報告 |
08 |
Final inspection report |
成品檢驗報告 |
09 |
Corrective & preventive actions report |
糾正預防記錄 |
10 |
Defective product evaluation report |
次品分析報告 |
11 |
Product test report |
產品測試報告 |
12 |
Product safety standard |
產品安全標準 |
13 |
Test equipment calibration certificate& record |
計量儀器校驗記錄 |
14 |
Sharp tools control procedure & record sharp tools losing investigation procedure |
利器控制程序及斷針記錄 (利器丟失調查程序) |
15 |
Daily issuance & return of sharp tools record |
利器日常收發記錄 |
16 |
Metal detection machine calibration record |
金屬探測機檢測記錄 |
17 |
Training plan & record (QC/worker) |
培訓計劃/記錄(Q.C/工人) |
18 |
Subcontracting semi-product inspection record |
外發加工檢驗記錄 |
19 |
Rejected lot control procedure & record |
不合格品的控制程序及記錄 |
20 |
Machine & equipment list |
機器設備清單 |
21 |
Machine repair & maintenance plan / record |
機器維修及保養計劃/記錄 |
22 |
Sanitation / cleaning plan or schedule |
每天清潔計劃 |
23 |
Pest control procedure & report pesticides usage & storage record |
防蟲計劃及報告,防蟲劑的使用及儲存記錄 |
24 |
Pest control evaluation report Bait&pest control device placement record |
害蟲活動研究報告,誘餌或滅蟲裝置放置地點的記錄 |
25 |
Documents related to subcontracting (OPA) (Including QC record, test report, qualify system audit report for subcontractor, subcontracting requirement etc….) |
如有外發單(包括OPA),請提供相應品質報告,測試報告,品質系統審核,外發單品質要求等) |
26 |
Job specifications |
崗位職責 |
上一篇:li&fung反恐審核清單
下一篇:利豐驗廠社會責任審核清單